Thursday, January 5, 2012

Another beautiful day in the Ozarks. I am so glad too.  We got the first delivery of wood for the Aquaponics greenhouse today. There is about 4 tons of wood out there to be cut up. We moved a wood rack into the greenhouse. We also now have all four IBC's inside. I took out the wall on the inside of the kennel building, and moved the 300gal water tank into it's new home. We scrapped the water tower idea, for now. I can use this tank with a 12v pump to push water back into the potable water system. This area will be heated, so for this winter it will have to do. This will at least help with the water problem if we should run into an extended power outage.  I have two more tanks to move into the greenhouse, then I can close up the end wall and begin setting the equipment in place. We still have to move one more heater into the kennel building and run the duct work. Every day we are getting a little closer. Claygirl has gone through the seed locker and ordered what we need to get started. I hope by the time the plants are ready to go into the new system, the system will be ready.